A metalworking shop in Podi, Herceg Novi. Since 2022 we have been making steel to the dimensions of the site — no middlemen, no subcontractors.
Everything we install is made in our own small workshop in Podi and fitted by our own crew.
We opened the workshop in 2022. Since then we have completed more than 150 jobs — railings, gates, stairs, canopies and frames for houses, apartments and hotels. Whoever measures the site sees the job through to installation.
We work with private clients, construction contractors and hoteliers on the coast and in central Montenegro.
Four rules we keep without exception, even when it means turning a job down.
The price in the quote is final. If something turns up that was not on the drawing, we stop and agree it with you rather than adding it to the invoice.
Whoever took the measurements runs the job through the workshop and comes out for the installation. Nothing gets lost in a handover.
We will not paint mild steel without galvanising for a building by the sea. We would rather recommend stainless than come back on a warranty claim in two years.
Five years on the load-bearing structure and on the anti-corrosion coating. The warranty is issued on paper, dated and signed.
Every weld is done by our own metalworker, not a subcontractor. Below — what the work looks like from the inside.